1234 Washington Street
Boston, MA 02118

 info@ac-h.com

Toll Free 1.800.321.3236

Phone 617.482.8383

Fax: 617.482.8384

Jib Cranes Overhead Cranes Hoists Benchoist Winches Car Pullers Monorails
Inspections Safety Training Engineering
Request Quote E-mail Sales
Directions
New Page 1

 

Based on how your facility is laid out,
and how you intend to use the system
it must be decided where the hoist travel will best serve the needs of your facility.

Any place that you need to have the trolley turn from one section of track on to another section you will need a switch,
the switch must be placed 4 feet before the section of track you are turning onto in order to complete the switch.
Also when planning any curves or turns in the track, plan on starting the curve 4 feet before you want to finish it.

Here are links to the load charts for the various rail choices we offer,
in order of lightest rail to heaviest to help you find the best option.


Hanger Spacing Tables


Top of the page Top of the page